(A) Actual overhead cost has exceeded the amount used as a basis for the establishment of the predetermined rate.
(B) Actual overhead cost has been less than the amount used as a basis for the establishment of the predetermined rate.
(C) Actual activity levels were higher than planned due to an increase in demand.
(D) An expected price increase in the overhead costs which was built into the overhead recovery rate did not take place.